KEY FEATURES
-
184kWh/60kW mobile charging pile helps the Water Conservancy E-commerce Logistics Park build a green and efficient charging network
Project Background
As a key regional logistics hub, the Shuili E-commerce Logistics Park has an average daily throughput of more than 200 electric logistics vehicles and faces the following operational pain points:
Insufficient charging facilities: The number of fixed charging piles in the park is limited, and there are serious queues during peak hours
Low operational efficiency: Vehicles need to wait for a long time to charge, which affects the efficiency of cargo turnover
High electricity costs: The charging cost pressure is high during the peak electricity price period during the day
Site restrictions: The construction of traditional charging stations requires grid transformation, and the approval cycle is long
Solution
Deploy LiChong 184kWh/60kW mobile charging energy storage system to build a new "mobile charging + smart scheduling" power replenishment system:
1. Flexible charging network layout
Based on the analysis of vehicle entry and exit lines, 3 mobile charging piles are deployed at key nodes such as platform loading and unloading areas and temporary parking areas
Support the "pile finds car" mode, and realize dynamic allocation of charging resources through GPS scheduling
2. Intelligent charging and discharging management
60kW DC fast charging: A 4.2-meter electric truck (82kWh battery) can be fully charged in 45 minutes
Dual-mode operation:
Charging mode: Provide fast charging for logistics vehicles during the day
Energy storage mode: Low-peak storage at night (0.28 yuan/kWh), peak discharge during the day (1.15 yuan/kWh)
3. Smart energy management
Access to the park energy management system to achieve:
Charging demand prediction
Load balancing control
Electricity cost optimization
Implementation effect
Operational efficiency: average waiting time of vehicles is shortened by 76%, and the average daily turnover is increased by 32%
Economic benefits: through peak-valley arbitrage, the annual income of a single pile reaches 52,000 yuan, and the investment recovery period is less than 3 years
Green carbon reduction: reduce the use of diesel backup generators by about 800 hours per year, and reduce carbon emissions by 56 tons
Expansion capability: support subsequent photovoltaic carport access and build an integrated photovoltaic storage and charging system
Customer testimony
"The flexible deployment of mobile charging piles has completely solved the problem of charging difficulties in our park. With the intelligent dispatching system, vehicles can now be charged as soon as they stop, and logistics efficiency has been qualitatively improved."
——Director Zhang, Facility Management Department of Water Conservancy E-commerce Logistics Park
-
GET A QUOTE